A Tesla Megapack caught fire at the Victorian Big Battery facility in Australia – TechCrunch

A 13-tonne Tesla Megapack caught hearth on Friday morning at a battery storage facility in south-east Australia. The blaze occurred throughout testing at between 10 and 10.15am native time, in keeping with Victorian Big Battery. The regional hearth service mentioned a specialist hearth crew had been dispatched to the positioning in Geelong, Victoria. Firefighters had been utilizing a hazmat equipment designed for hazardous chemical spills and specialist drones to conduct atmospheric monitoring, in keeping with Fire Rescue Victoria.

The location was evacuated and there have been no accidents, Victorian Massive Battery mentioned in an announcement. It added that the positioning had been disconnected from the ability grid and that there will likely be no affect to the electrical provide. French power firm Neoen, which operates the power, and contractor Tesla are working with emergency companies to handle the scenario.

On account of the fireplace, a warning for poisonous smoke has been issued within the close by Batesford, Bell Put up Hill, Beautiful Banks and Moorabool areas, reviews The Sydney Morning Herald. Residents had been warned to maneuver indoors, shut home windows, vents and fireside flues and convey their pets inside.

The Victorian Massive Battery website, a 300 MW/450 MWh battery storage facility, is seen as key to the Victorian authorities’s 50 % renewable power goal by 2030. It follows the success of Neoen and Tesla’s 100 MW/129 MWh battery farm in Hornsdale in South Australia, which was accomplished forward of schedule and has resulted in multi-million dollar savings for market gamers and shoppers. Each websites basically present a regional energy backup for when renewable power will not be accessible, successfully filling the hole when the solar isn’t shining and the wind isn’t blowing.

In February, Neoen introduced that the Victorian Massive Battery would utliize Tesla’s megapacks — utility-sized batteries produced on the firm’s Gigafactory — and Autobidder software program to promote energy to the grid. Victorian Massive Battery has a contract with the Australian Power Market Operator (AEMO). As a part of the pact, the positioning will present power stability by unlocking a further 250 MW of peak capability on the present Victoria to New South Wales Interconnector over the following decade of Australian summers.

Editor’s be aware: This submit initially appeared on Engadget.